Another Successful Overseas Installation Project by OSS – Ashgabat TV Tower
October 14th, 2011Following on from the successful installation of the mobile storage system at the new Sony Television facility in Turkmenistan, OSS were again contracted in to design, build, and oversee the installation of an even bigger roller rack storage system at the newly built and very impressive TV tower in Ashgabat.
The mobile storage system, which was built by OSS in the UK before being transported to site for assembly and installation, was specifically designed for the housing of tapes and discs used at the television centre. The system provides for an impressive 7,500 metres of storage space in over 1,100 storage bays, providing the staff with a space-saving yet easily accessible system to manage their media.

The new TV tower under construction in Ashgabat, Turkmenistan,
the mobile storage system was installed on the 3rd floor.
The entire project took just 5 weeks to complete, during which time OSS flew engineers to the site to work with local engineers to carry out the successful installation on time and on budget.
For more info on this project see our Case Study – Ashgabat Television Tower Mobile Storage Solution for Tapes & Discs
To find out how OSS can help you from concept, through planning and manufacture, to finished installation, get in touch with us today!
+44 (0)20 8371 4200






OSS on facebook